Plate bending with our new Press Brake

Bending steel for the curved shape of a vessels hull is always something that needs to be done, so we have recently installed a 50ton press brake that allows us to bend steel to suit the shape of a vessels hull with ease. Here we can see the shell plates being formed for the vessel … Read more

New Airless Paint Spraying Equipment

With the increasing amount of vessels coming to our yards for shot blasting and painting, we needed to increase the turn around speed of jobs, and the way to achieve that was to invest in airless paint spraying equipment for the application of protective coatings. The efficiency of the airless spraying equipment is incredible to … Read more

New Facilities – Arctic Road Dry Dock

In September 2019 we were given the most amazing opportunity to take on the long unused dry dock in Cowes. The yard, known as Marvins Yard, and later Coles Yard was in a poor state, due to the dock gates being removed in the 1990’s. The dock gates were removed and the concrete gate buttresses … Read more

New crane to help us rebuild the dry dock

To Help us rebuild the Arctic Road Dry Dock, we needed a crane to lift the huge amounts of heavy materials and equipment. We were incredibly fortunate to find this Priestman MC250 Crawler Crane, in a  Norfolk boatyard. We had the crane transported back to the Isle of Wight, and it is now in operation … Read more

Shot Blasting now undertaken by us

The expansion of the business with the new dry dock has opened up a new line of work, and our core belief is to be a self sufficient independent shipyard, able to provide all services that are required. With this in mind, we have increased our abilities and service to include shot blasting. This allows … Read more

Protective Coating Application – Airless paint spraying

With the increasing amount of work coming through the business, particularly in the steel ship repair, we have invested in airless paint spraying equipment for protective coating application. The airless paint sprayer plant allows rapid and even application of paint which is an essential requirement for larger vessels that demand a fast repair turnaround. The … Read more

New office

The new Arctic Road Dry Dock has provided the company with much needed space, and one area that was much needed was an office space where we can keep track on work.

Magazine article – Clarence Yard

Island Life Magazine recently wrote an article about Sam Fulford and the work undertaken to get the East Cowes Clarence Yard back into operation. The Clarence yard gave the business the huge step to grow. Follow the link to have a read. https://www.islandlifemagazine.co.uk/taking-back-ground-for-island-boatbuilders/

Shrink wrap covering

With winter coming in, it has become clear that we need to have a good method of covering vessels undergoing repair. We need to minimise downtime dur to wet weather, and the best way to overcome this is by using the shrink wrap method of covering. We build a scaffold structure over the job, and … Read more